Preliminary Design Guidance for Proposed Mainstream Dams in the Lower Mekong River Basin (PDG)
- DOI
- 10.52107/mrc.ajutqi
- Title
- Preliminary Design Guidance for Proposed Mainstream Dams in the Lower Mekong River Basin (PDG)
- Author
- MRC
- Abstract
- The new Preliminary Design Guidance is an updated version of the original PDG introduced in 2009. It incorporates not only what the MRC Member Countries have learnt from their own experience with hydropower, but also from examples and best practices around the world. It also includes the most current knowledge regarding design criteria, science and technology. While the older PDG spanned this range of construction and operation elements (hydraulics; sediment transport; geomorphology; water quality; aquatic ecology; fish and fisheries; dam safety; and navigation), the new PDG now includes hydrology and socio-economic impact to reflect the greater attention paid today to riparian communities and riverine livelihoods.
- Publication Date
- Publisher
- MRC Secretariat
- Categories
- Policies, Procedures and Guidelines
- Access
- Open Access
- Copyright
- MRC
- License
- Creative Commons Attribution–NonCommercial 4.0
File | Size | |
---|---|---|
The
Preliminary Design Guidance for Proposed Mainstream Dams in the Lower Mekong River Basin (PDG)
SHA-1:8e3cc36c174923c1dde21d3b934e01dde7810b3d |
23 MB | Download |
Share
Cite as
MRC. (2023). Preliminary Design Guidance for Proposed Mainstream Dams in the Lower Mekong River Basin (PDG). Vientiane: MRC Secretariat. https://doi.org/10.52107/mrc.ajutqi
This website uses cookies to analyse how our site is used and optimise functionality. Navigating this site means you accept our use of cookies.